Wednesday, September 9, 2009

Facts about the new TCEM Building

Building Name: Tooele County Emergency Management Building
Houses: Tooele County Emergency Management Department, Emergency Operations Center (EOC), and the 911 Dispatch Center
General Contractor: Ascent Construction
Construction: January 2008 - May 2009
Total Square Footage: 16,000 sq. ft.
Cost: approx. $5 million ($2.5 million provided by CSEPP, $2.5 million provided by Tooele County)
Structural Integrity: meets FEMA requirements for a critical facility, exceeds current building codes for seismic activity up to magnitude 7.4 by 50%
EOC Features: kitchen facility, men’s and women’s sleeping quarters and shower facilities for long term activation
Redundancies: a 6,000 gallon backup drinking water source, two backup power sources (UPS and a diesel generator with 4,000 gallon diesel tank), a heating system which runs on propane (3,000 gallons of propane storage), a backup battery bank for communications systems, and off-site telephone connections and power failure telephones; all capabilities allowing the EOC to continue operations for two weeks without outside assistance
Other Features: American Disabilities Act (ADA) compliant throughout, environmentally friendly: maximum use of natural lighting, high efficiency heating and cooling system with extra insulation, motion sensors to control lights in offices and storage rooms, and water in bathroom faucets